Project References
Completed Projects

Pahaytc Sdn Bhd

 No
Project Name
Contract No
Contract Amount
Completion Date
1 IMPROVEMENT OF DISTRICT ROADS IN BRUNEI MUARA & TUTONG DISTRICT SRM/006/97 (26/04/97)  $5,298,811 1998
2 REPAIRWORKS TO MAKTAB SOAS, BANDAR SERI BEGAWAN, BRUNEI DARUSSALAM DBSBM/063 (11/05/98) $319,785 1998
3 SUPPLY AND INSTALLATION OF CURTAIN WALL SYSTEM TO MOF BUILDING DOD/14/97 (05/01/98) $7,166,000 1999
4 UPGRADING OF DISTRICT ROADS IN HIGH DENSITY AREAS, PACKAGE II DOR/SRM051/97 (11/07/98) $6,775,435 1999
5 REPAIRING TO HARDSTANDING AT MUARA PORT JKR/DTS/013/1998-T/IV $1,387,255 1999
6 MENGGANTI & MEMPERBAIKI PAIP  DI SEPANJANG JLN MENTERI BESAR & JLN KEBANGSAAN DWS/04197 (15/06/98) $424,970 1999
7 SLOPE PROTECTION  FOR TELECOM TOWER AT BUKIT SALILAH DTS/023/1998  (30/03/99) $1,742,513 2000
8 RENOVATION & UPGRADING OF CHECKPOINT AT KUALA LURAH DTS/028/99  (21/05/00) $479,168 2000
9 PROPOSED 10 UNITS OF 2 STOREY LIGHT INDUSTRIAL BUILDING KUALA LURAH   $2,299,900 2001
10 REFURBISHING OF BUKIT BARUN TREATMENT WORKS DWS/032/97 (05/06/00) $2,090,000 2001
11 TEMPORARY CHECKPOINT AT LABU, TEMBURONG DTS/02/EXC  (23/09/00) $1,468,000 2001
12 PROPOSED GRANDSTAND, PARADE GRANDSTAND, RUNNING TRACK & FIELD & SWIMMIING POOL DTS/V.6/00  (19/12/00) $1,382,000 2001
13 MEMBEKAL & MENGHANTAR BATU BATU PECAH & BULAT KEPADA SRM SRM/005/00  (08/06/00) $1,000,000 2001
14 RECONSTRUCTION OF JALAN LAMUNIN-RAMBAI-MERIMBUN, TUTONG DISTRICT DOR/VI.2/2002 (17/05/02) $10,949,428 2004
15 PROPOSED KIP - PHASE 3 OFF ROAD CONSTRUCTION PROJECT  KG. KIULAP COMMERCIAL AREA PIT $851,305 2004
16 MEMBINA SEMULA MAKTAB SAINS PADUKA SERI BEGAWAN SULTAN, JLN MUARA PAKEJ 2. DTS/VI.2/2002 (17/06/02) $26,389,214 2005
17 MEMBAIK PULIH JALAN BANGAR-PUNI-LABU, DAERAH TEMBURONG, NBD, PACKAGE 1 BSB/DOR/VI.6/02 (31-08-02) $12,582,536 2005
18 UPGRADING OF HIGH DENSITY AREA IN TUTONG DISTRICT PHASE 1, BRUNEI DARUSSALAM BSB/DOR/VI.5/02 (03/08/02) $6,149,580 2005
19 PEMBINAAN MAHKAMAH SYARIAH AGUNG BARU, NEGARA BRUNEI DARUSSALAM DTS/VI.02/01  (20/07/01) $14,680,000 2006
20 CONTROL OF BEACH EROSION OF COASTLINE OF BRUNEI DARUSSALAM - KG. PENANJONG BSB/DDS/VI.2/03 - (27-10-03) $8,499,674 2006
21 PENGALIRAN SG. MENGLAIT DAN KG. KIARONG CONTRACT 2 - PEMBAIKAN PENGALIRAN SG. MENGLAIT BSB/DDS/VI.3/03   (05-12-03) $5,875,905 2006
22 BRUNEI-MUARA-TUTONG WATER SUPPLY SCHEME STAGE 6 PHASE 2 AND RAW WATER PUMPING STATION JKR/DWS/029/03  14-03-04 $8,976,572 2007
23 KB/SERIA/SG. LIANG AND LABI WATER SUPPLY STAGE 5 PHS 1 (PKG 2) SERIA RAW WATER PUMP BSB/DWS/VI.001/06 $10,287,689 2008
24 KERJA-KERJA RAWATAN SALURAN NAJIS GADONG - KONTRAK 2 - AUGMENTATION WORKS BSB/DDS/VI.2/04 $8,282,061 2008
25 REHALBILITATION OF EXISTING ASPHALT ROAD BRUNEI-MUARA DISTRICT (PACKAGE 2) BSB/DOR/VI.2/05 $6,996,507 2008
26 THREE YEARS TERM CONTRACT FOR MAINT., REPAIR  & MINOR NEW ADDITIONAL TO BUILDING & CIVIL ENGINEERING WORKS FOR RBAF (81)JPPP/LTN/19/03 01/06/05 $6,000,000 2008
27 KERJA-KERJA PEMBAIKAN JALAN RAYA YANG SEDIA ADA DI-DAERAH MUARA DAN TUTONG MENGGUNAKAN CARA "STABILIZATION" BSB/DOR/V.2/2006 $2,000,000 2008
28 LORONG TENGAH SERIA HOUSING SCHEME EARTHWORKS PHASE 3A & 3B, NEGARA BRUNEI DARUSSALAM BSB/DWS/III.002/07 $10,891,130 2009
29 REPAIR AND RESURFACING OF EXISTING ASPHALT ROADS IN NEGARA BRUNEI DARUSSALAM BSB/DOR/V.2/2006 $2,000,000 2009
30 PEMELIHARAN INFRASTRUKTUR PERINDUSTRIAN LAMBAK KANAN, NEGARA BRUNEI DARUSSALAM BSB/DOR/V.2/2006 $695,000 2009
31 PEMBINAAN TANGKI TANGKI SIMPANAN AIR-LUMAPAS   $6,929,580 2009
32  EXTENSION OF SERVICE ROAD AT ISTANA NURUL IMAN   $2,302,767 2010
33  REPAIR AND RESURFACING OF EXISTING ASPHALT ROADS IN NBD BSB/DOR/SRM02/09 $2,000,000 2010
34  PEMBINAAN TANGKI-TANGKI SIMPANAN AIR DAERAH BRUNEI-MUARA (KG. SELAYUN, KG. MASIN & KG. BATONG) BSB/DWS/VI.003/2 $6,368,763 2011
35 REHABILITATION OF MUARA TUTONG HIGHWAY BSB/DOR/VI.8/08 $19,307,270 2011
36 SUPPLY AND REPLACE DISTRIBUTION PIPE BRUNEI MUARA/TUTONG JALAN GADONG BSB/DWS/VI.001/07 $8,782,055 2011
37 UPGRADING OF ROAD NETWORKS AND DRAINAGE SYSTEM AT KG. MATA-MATA & KG. TUNGKU AREA, GADONG BSB/DOR/VI.3/08 $13,500,000 2011
38 KG. MERAGANG RESETTLEMENT/HOUSING SCHEME INFRASTRUCTURE STAGE 7 "BALANCE SEWERAGE WORKS" NEGARA BRUNEI DARUSSALAM JKP/21/2009 $4,344,528 2011
39 MELEBARKAN JALAN LAMUNIN FASA 1 BSB/DOR/V1.08/2009 $14,575,110 2012
40 WIDENING OF JALAN KEBANGSAAN, NEGARA BRUNEI DARUSSALAM BSB/DOR/VI.11/2009 $6,289,473 2012
41 RETENDER FOR LORONG TENGAH SERIA HOUSING-SCHEME EXTERNAL SERVICES INFRASTRUCTURE (COMPLETION BALANCE WORKS) NBD BSB/DWS/VI.001/2009 $7,835,912 2012
42 PEMBINAAN DUA LORONG BERKEMBAR (2.5KM) DAN MEMBAIKPULIH, JALAN JERUDONG, BRUNEI BSB/DOR/VI.07/10 $14,449,470 2012
43 PEMBINAAN JALAN DAN JAMBATAN PENGHUBUNG JALAN DARI KAWASAN LAPANGAN TERBANG LAMA KE MENGLAIT BSB/DOR/IV.13/2010 $8,473,341 2013
44 SUPPLY AND LAY MAIN PIPELINE FROM MELABAU TO KOTA BATU BSB/DWS/VI.002/2007 $20,819,895 2013
45 KG. MERAGANG PERPINDAHAN/SKIM PERUMAHAN KG MERAGANG-KERJA TANAH DAN INFRASTRUKTUR PEMBENTUNGAN UTAMA DAN LOGI RAWATAN JKP/32/2009 $16,592,507 2015
46 SOURCE IMPROVEMENT WORKS FOR BRUNEI / MUARA / TUTONG WATER SUPPLY - ULU TUTONG DAM - (RETENDER) BSB/DWS/VI.01/2009 $85,481,769 2017
      $411,992,876  

 