Project References
Completed Projects

Pahaytc Sdn Bhd

 No
Project Name
Contract Amount
Completion Date
1 IMPROVEMENT OF DISTRICT ROADS IN BRUNEI MUARA & TUTONG DISTRICT $5,298,811 1998
2 REPAIRWORKS TO MAKTAB SOAS, BANDAR SERI BEGAWAN, BRUNEI DARUSSALAM $319,785 1998
3 SUPPLY AND INSTALLATION OF CURTAIN WALL SYSTEM TO MOF BUILDING $7,166,000 1999
4 UPGRADING OF DISTRICT ROADS IN HIGH DENSITY AREAS, PACKAGE II $6,775,435 1999
5 REPAIRING TO HARDSTANDING AT MUARA PORT $1,387,255 1999
6 MENGGANTI & MEMPERBAIKI PAIP  DI SEPANJANG JLN MENTERI BESAR & JLN KEBANGSAAN $424,970 1999
7 MENGGANTI TANGKI AIR DI LOJI PENAPISAN AIR SUMBLING, TEMBURONG $374,677 1999
8 SLOPE PROTECTION  FOR TELECOM TOWER AT BUKIT SALILAH $1,742,513 2000
9 RENOVATION & UPGRADING OF CHECKPOINT AT KUALA LURAH $479,168 2000
10 PROPOSED 10 UNITS OF 2 STOREY LIGHT INDUSTRIAL BUILDING KUALA LURAH $2,299,900 2001
11 REFURBISHING OF BUKIT BARUN TREATMENT WORKS $2,090,000 2001
12 IMPROVEMENT OF WATER DISTRIBUTION SYSTEM IN BRUNEI MUARA/TUTONG DISTRICT $1,735,908 2001
13 TEMPORARY CHECKPOINT AT LABU, TEMBURONG $1,468,000 2001
14 PROPOSED GRANDSTAND, PARADE GRANDSTAND, RUNNING TRACK & FIELD & SWIMMIING POOL $1,382,000 2001
15 MEMBEKAL & MENGHANTAR BATU BATU PECAH & BULAT KEPADA SRM $1,000,000 2001
16 RECONSTRUCTION OF JALAN LAMUNIN-RAMBAI-MERIMBUN, TUTONG DISTRICT $10,949,428 2004
17 PROPOSED KIP - PHASE 3 OFF ROAD CONSTRUCTION PROJECT  KG. KIULAP COMMERCIAL AREA $851,305 2004
18 MEMBINA SEMULA MAKTAB SAINS PADUKA SERI BEGAWAN SULTAN, JLN MUARA PAKEJ 2. $26,389,214 2005
19 MEMBAIK PULIH JALAN BANGAR-PUNI-LABU, DAERAH TEMBURONG, NBD, PACKAGE 1 $12,582,536 2005
20 UPGRADING OF HIGH DENSITY AREA IN TUTONG DISTRICT PHASE 1, BRUNEI DARUSSALAM $6,149,580 2005
21 PEMBINAAN MAHKAMAH SYARIAH AGUNG BARU, NEGARA BRUNEI DARUSSALAM $14,680,000 2006
22 CONTROL OF BEACH EROSION OF COASTLINE OF BRUNEI DARUSSALAM - KG. PENANJONG $8,499,674 2006
23 PENGALIRAN SG. MENGLAIT DAN KG. KIARONG CONTRACT 2 - PEMBAIKAN PENGALIRAN SG. MENGLAIT $5,875,905 2006
24 BRUNEI-MUARA-TUTONG WATER SUPPLY SCHEME STAGE 6 PHASE 2 AND RAW WATER PUMPING STATION $8,976,572 2007
25 REPLACEMENT OF AC PIPE/OLD PIPES ALONG JALAN JUNJUNGAN KUALA LURAH AREA $2,848,692 2007
26 KB/SERIA/SG. LIANG AND LABI WATER SUPPLY STAGE 5 PHS 1 (PKG 2) SERIA RAW WATER PUMP $10,287,689 2008
27 KERJA-KERJA RAWATAN SALURAN NAJIS GADONG - KONTRAK 2 - AUGMENTATION WORKS $8,282,061 2008
28 REHALBILITATION OF EXISTING ASPHALT ROAD BRUNEI-MUARA DISTRICT (PACKAGE 2) $6,996,507 2008
29 THREE YEARS TERM CONTRACT FOR MAINT., REPAIR  & MINOR NEW ADDITIONAL TO BUILDING & CIVIL ENGINEERING WORKS FOR RBAF $6,000,000 2008
30 KERJA-KERJA PEMBAIKAN JALAN RAYA YANG SEDIA ADA DI-DAERAH MUARA DAN TUTONG MENGGUNAKAN CARA "STABILIZATION" $2,000,000 2008
31 LORONG TENGAH SERIA HOUSING SCHEME EARTHWORKS PHASE 3A & 3B, NEGARA BRUNEI DARUSSALAM $10,891,130 2009
32 PEMBINAAN TANGKI TANGKI SIMPANAN AIR-LUMAPAS $6,929,580 2009
33 REPAIR AND RESURFACING OF EXISTING ASPHALT ROADS IN NEGARA BRUNEI DARUSSALAM $2,000,000 2009
34 PEMELIHARAN INFRASTRUKTUR PERINDUSTRIAN LAMBAK KANAN, NEGARA BRUNEI DARUSSALAM $695,000 2009
35 REPAIR AND RESTORATION WORK FOR TWO BUILDINGS AT JALAN SUMBILING $274,851 2009
36 EXTENSION OF SERVICE ROAD AT ISTANA NURUL IMAN $2,302,767 2010
37 REPAIR AND RESURFACING OF EXISTING ASPHALT ROADS IN NBD $2,000,000 2010
38 REHABILITATION OF MUARA TUTONG HIGHWAY $19,307,270 2011
39 UPGRADING OF ROAD NETWORKS AND DRAINAGE SYSTEM AT KG. MATA-MATA & KG. TUNGKU AREA, GADONG $13,500,000 2011
40 SUPPLY AND REPLACE DISTRIBUTION PIPE BRUNEI MUARA/TUTONG JALAN GADONG $8,782,055 2011
41 PEMBINAAN TANGKI-TANGKI SIMPANAN AIR DAERAH BRUNEI-MUARA (KG. SELAYUN, KG. MASIN & KG. BATONG) $6,368,763 2011
42 KG. MERAGANG RESETTLEMENT/HOUSING SCHEME INFRASTRUCTURE STAGE 7 "BALANCE SEWERAGE WORKS" NEGARA BRUNEI DARUSSALAM $4,344,528 2011
43 MEMBEKAL DAN MENGHANTAR ALAT-ALAT GANTI  MEKANIKAL DAL ELEKTRIKAL DI-LOJI RAWATAN AIR BUKIT BARUN TUTONG $1,596,636 2011
44 MELEBARKAN JALAN LAMUNIN FASA 1 $14,575,110 2012
45 PEMBINAAN DUA LORONG BERKEMBAR (2.5KM) DAN MEMBAIKPULIH, JALAN JERUDONG, BRUNEI $14,449,470 2012
46 RETENDER FOR LORONG TENGAH SERIA HOUSING-SCHEME EXTERNAL SERVICES INFRASTRUCTURE (COMPLETION BALANCE WORKS) NBD $7,835,912 2012
47 WIDENING OF JALAN KEBANGSAAN, NEGARA BRUNEI DARUSSALAM $6,289,473 2012
48 PEMBINAAN JALAN DAN JAMBATAN PENGHUBUNG JALAN DARI KAWASAN LAPANGAN TERBANG LAMA KE MENGLAIT $8,473,341 2013
    $295,929,467  

Previous Page Next Page
 
 
Latest News
more news
 
Recent Projects